- The Kwik-Sew rayon georgette dress still needs hemming, and needs the bow piece attached assuming I'm using it (I probably am, though I may not do a bow as such... more on that later.)
- The copy of the black bag in tapestry fabric needs, at least, the shell and lining to be topstitched together around the upper edge. I may need to clean up some of the existing topstitching as well; I was fighting my machine a bit to get it to sew with the very heavy thread I used.
- A knit cardigan I've been working on for weeks; all the main pieces now exist and need to be sewn together, and after that I have to decide whether it needs any borders, closures, etc.
As for what's gone into stash, boy howdy. Here's a preview:
Fuzzy wool bouclé knit, Chinese brocade, the lining for the aforementioned bag, wool georgette, wool challis print, eight Bemberg linings, and embroidered organza. With the exception of the bag lining (from Dressew) all of these came from the apparently soon-to-close Gala Fabrics location on South Granville. The total is... uh... in excess of 31 yards. Maybe not quite, since I did use up some of that bag lining, but still, it's a net addition of nearly 30 yards, and there'll be more for December. I need to get going.
No comments:
Post a Comment